File #: 24-G-223    Version: Name:
Type: Staff Report Status: Recommended Motion (Section D)
File created: 10/1/2024 In control: City Council
On agenda: 10/23/2024 Final action:
Title: WATERFRONT PUBLIC CONSULTATION FEEDBACK That Staff Report ACC001-24 concerning the results of the public consultations related to Marshall Green's report, entitled The Southshore, Barrie Sports and a Revitalized Downtown, be received. (ACC001-24) That notwithstanding previous Council decisions concerning the locations for a Performing Arts Centre and a Multi-Use Sports Field, the following be undertaken: 1. a) That in light of the work completed to date by Hariri Pontarini Architects (HPA) on the Barrie Performing Arts Centre Programming and Concept Design Final Report and notwithstanding the requirements of the Procurement By-law, HPA be retained to complete a schematic design for a new Performing Arts Centre at the current Sea Cadets site at an estimated cost of $200,000 to be funded from the Theatre Reserve, and that the design be prepared with the following considerations: * An approximately 45,000 sq. ft facility that includes both larger (600 seat) and smaller (250 seat) per...
Attachments: 1. ACC001-24
Title
WATERFRONT PUBLIC CONSULTATION FEEDBACK

That Staff Report ACC001-24 concerning the results of the public consultations related to Marshall Green's report, entitled The Southshore, Barrie Sports and a Revitalized Downtown, be received. (ACC001-24)

That notwithstanding previous Council decisions concerning the locations for a Performing Arts Centre and a Multi-Use Sports Field, the following be undertaken:

1. a) That in light of the work completed to date by Hariri Pontarini Architects (HPA) on the Barrie Performing Arts Centre Programming and Concept Design Final Report and notwithstanding the requirements of the Procurement By-law, HPA be retained to complete a schematic design for a new Performing Arts Centre at the current Sea Cadets site at an estimated cost of $200,000 to be funded from the Theatre Reserve, and that the design be prepared with the following considerations:

* An approximately 45,000 sq. ft facility that includes both larger (600 seat) and smaller (250 seat) performance spaces;

* The facility be designed with a maximum total building cost of $65M in hard and soft construction costs for the building itself including fit out of all seating and audio-visual components; and

b) That staff undertake the required site due diligence (including but not limited to geotechnical investigations) to determine the feasibility of utilizing the current Sea Cadets site and any required surrounding City lands for a new Performing Arts Centre, and the cost of such investigations to a maximum of $375,000 be funded from the Theatre Reserve.

c) That a Full Time Capital Project Manager be retained by Corporate Facilities immediately to coordinate the site due diligence investigations and schematic design work and the position be funded from the FC1138 Performing Arts Centre Redevelopment capital project/Theatre Reserve; and

d) That staff report back to General Committee with the results of the due diligence work and schematic design as well as the estim...

Click here for full text